Solomon Islands vs Turkey: Dealing with construction permits: Time

Solomon Islands
99 days
in 2019
Turkey
100 days
in 2019
Solomon Islands rank
143rd
Turkey rank
140th

Dealing with construction permits: Time over time

  • Solomon Islands
  • Turkey
050100150200520122019

How they compare

Turkey currently reports 100 days against 99 days in Solomon Islands, a difference of 1 days.

Across all 15 years both countries report, Turkey has been ahead every year.

Solomon Islands ranks 143rd and Turkey ranks 140th of 185 countries.

Turkey has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Solomon Islands Turkey Difference Ahead
2000s 99 days 139 days 40 days Turkey
2010s 99 days 109.6 days 10.6 days Turkey

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Solomon Islands or Turkey?
Turkey, at 100 days against 99 days in Solomon Islands as of 2019.
What is the difference in dealing with construction permits: time between Solomon Islands and Turkey?
1 days, with Turkey ahead.
How many years of comparable data are there for Solomon Islands and Turkey?
15 years are reported by both, from 2005 to 2019.
How do Solomon Islands and Turkey rank globally for dealing with construction permits: time?
Solomon Islands ranks 143rd and Turkey ranks 140th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.