Sri Lanka vs Syria: Dealing with construction permits: Time

Sri Lanka
86 days
in 2019
Syria
87 days
in 2012
Sri Lanka rank
160th
Syria rank
158th

Dealing with construction permits: Time over time

  • Sri Lanka
  • Syria
050100150200200520122019

How they compare

Syria currently reports 87 days against 86 days in Sri Lanka, a difference of 1 days.

Across all 8 years both countries report, Sri Lanka has been ahead every year.

Sri Lanka ranks 160th and Syria ranks 158th of 185 countries.

Sri Lanka has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sri Lanka Syria Difference Ahead
2000s 176.2 days 87 days 89.2 days Sri Lanka
2010s 176.67 days 87 days 89.67 days Sri Lanka

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Sri Lanka or Syria?
Syria, at 87 days against 86 days in Sri Lanka as of 2012.
What is the difference in dealing with construction permits: time between Sri Lanka and Syria?
1 days, with Syria ahead.
How many years of comparable data are there for Sri Lanka and Syria?
8 years are reported by both, from 2005 to 2012.
How do Sri Lanka and Syria rank globally for dealing with construction permits: time?
Sri Lanka ranks 160th and Syria ranks 158th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.