Sri Lanka vs United Kingdom: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Sri Lanka
- United Kingdom
How they compare
Sri Lanka currently reports 86 days against 86 days in United Kingdom, a difference of 0 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Sri Lanka ahead.
Sri Lanka ranks 160th and United Kingdom ranks 160th of 185 countries.
Sri Lanka has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Sri Lanka | United Kingdom | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 176.2 days | 140 days | 36.2 days | Sri Lanka |
| 2010s | 138.3 days | 87.4 days | 50.9 days | Sri Lanka |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Sri Lanka or United Kingdom?
- Sri Lanka, at 86 days against 86 days in United Kingdom as of 2019.
- What is the difference in dealing with construction permits: time between Sri Lanka and United Kingdom?
- 0 days, with Sri Lanka ahead.
- How many years of comparable data are there for Sri Lanka and United Kingdom?
- 15 years are reported by both, from 2005 to 2019.
- How do Sri Lanka and United Kingdom rank globally for dealing with construction permits: time?
- Sri Lanka ranks 160th and United Kingdom ranks 160th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.