Switzerland vs Tajikistan: Dealing with construction permits: Time

Switzerland
156 days
in 2019
Tajikistan
157 days
in 2019
Switzerland rank
75th
Tajikistan rank
74th

Dealing with construction permits: Time over time

  • Switzerland
  • Tajikistan
0100200300200520122019

How they compare

Tajikistan currently reports 157 days against 156 days in Switzerland, a difference of 1 days.

Across all 15 years both countries report, Tajikistan has been ahead every year.

Switzerland ranks 75th and Tajikistan ranks 74th of 185 countries.

Tajikistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Switzerland Tajikistan Difference Ahead
2000s 156 days 237 days 81 days Tajikistan
2010s 156 days 162.3 days 6.3 days Tajikistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Switzerland or Tajikistan?
Tajikistan, at 157 days against 156 days in Switzerland as of 2019.
What is the difference in dealing with construction permits: time between Switzerland and Tajikistan?
1 days, with Tajikistan ahead.
How many years of comparable data are there for Switzerland and Tajikistan?
15 years are reported by both, from 2005 to 2019.
How do Switzerland and Tajikistan rank globally for dealing with construction permits: time?
Switzerland ranks 75th and Tajikistan ranks 74th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.