Dealing with construction permits: Time in Tajikistan

Tajikistan: Dealing with construction permits: Time was 157 days in 2019. ▼ Falling

Latest (2019)
157 days
Change on year
unchanged
World rank
74th
of 185 countries
All-time high
320 days
in 2008
All-time low
156 days
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Time in Tajikistan, 2005–2019

01002003002005201220192005: 220 days2006: 220 days2007: 220 days2008: 320 days2009: 205 days2010: 171 days2011: 171 days2012: 171 days2013: 171 days2014: 156 days2015: 156 days2016: 156 days2017: 157 days2018: 157 days2019: 157 days

Source: World Bank. Measured in days.

Analysis

Tajikistan recorded 157 days for dealing with construction permits: time in 2019.

The figure is down 23.4% over ten years.

Over the whole period, dealing with construction permits: time in Tajikistan peaked at 320 days in 2008 and was at its lowest, 156 days, in 2014.

Tajikistan ranks 74th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 237 days 205 days 320 days 5
2010s 162.3 days 156 days 171 days 10

Countries ranked near Tajikistan

  1. 72 Kenya 159 days compare
  2. 73 Belarus 158 days compare
  3. 75 Switzerland 156 days compare
  4. 76 Luxembourg 155 days compare
  5. 76 South Africa 155 days compare

See the full ranking of 187 places →

More private sector data for Tajikistan

All data for Tajikistan →

Frequently asked questions

What is dealing with construction permits: time in Tajikistan?
Dealing with construction permits: time in Tajikistan was 157 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Tajikistan?
The highest recorded value was 320 days in 2008.
What is the lowest dealing with construction permits: time recorded in Tajikistan?
The lowest recorded value was 156 days in 2014.
How does Tajikistan rank for dealing with construction permits: time?
Tajikistan ranks 74th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Tajikistan?
Over the last ten years it is down 23.4%. The long-run trend across the full record is falling.
Where does this Tajikistan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.