Dealing with construction permits: Time (days) (Time days) in Tajikistan
Tajikistan: Dealing with construction permits: Time was 157 days in 2019. ▼ Falling
Dealing with construction permits: Time in Tajikistan, 2005–2019
Source: World Bank. Measured in days.
Analysis
Tajikistan recorded 157 days for dealing with construction permits: time in 2019.
The figure is down 23.4% over ten years.
Over the whole period, dealing with construction permits: time in Tajikistan peaked at 320 days in 2008 and was at its lowest, 156 days, in 2014.
Tajikistan ranks 76th of 188 countries on this measure, in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Dealing with construction permits: Time in Tajikistan, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 220 days | — |
| 2006 | 220 days | +0.0% |
| 2007 | 220 days | +0.0% |
| 2008 | 320 days | +45.5% |
| 2009 | 205 days | -35.9% |
| 2010 | 171 days | -16.6% |
| 2011 | 171 days | +0.0% |
| 2012 | 171 days | +0.0% |
| 2013 | 171 days | +0.0% |
| 2014 | 156 days | -8.8% |
| 2015 | 156 days | +0.0% |
| 2016 | 156 days | +0.0% |
| 2017 | 157 days | +0.6% |
| 2018 | 157 days | +0.0% |
| 2019 | 157 days | +0.0% |
Tajikistan compared with similar countries
- Tajikistan's 157 days is below the median for lower middle income countries, which is 159 days, 99% of the median. (47 countries reporting)
- Tajikistan's 157 days is above the median for Europe & Central Asia, which is 156 days, 1.0× the median. (49 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 237 days | 205 days | 320 days | 5 |
| 2010s | 162.3 days | 156 days | 171 days | 10 |
Countries ranked near Tajikistan
- 74 Kenya 159 days compare
- 75 Belarus 158 days compare
- 77 Switzerland 156 days compare
- 78 Luxembourg 155 days compare
- 78 South Africa 155 days compare
More private sector data for Tajikistan
- Merchandise trade 61.1% (2025)
- Food imports 26.5% (2023)
- Manufactures imports 61.9% (2023)
- Merchandise imports 8.31 billion current US$ (2025)
- Food exports 5.2% (2023)
- Manufactures exports 17.8% (2023)
- Merchandise exports 2.49 billion current US$ (2025)
- Merchandise exports (current US$), per capita 230.75 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.1409 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 27.84 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: time in Tajikistan?
- Dealing with construction permits: time in Tajikistan was 157 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Tajikistan?
- The highest recorded value was 320 days in 2008.
- What is the lowest dealing with construction permits: time recorded in Tajikistan?
- The lowest recorded value was 156 days in 2014.
- How does Tajikistan rank for dealing with construction permits: time?
- Tajikistan ranks 76th out of 188 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Tajikistan?
- Over the last ten years it is down 23.4%. The long-run trend across the full record is falling.
- Where does this Tajikistan data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.