Syria vs United Kingdom: Dealing with construction permits: Time (days) (Time days)

Syria
87 days
in 2012
United Kingdom
86 days
in 2019
Syria rank
161st
United Kingdom rank
163rd

Dealing with construction permits: Time (days) (Time days) over time

  • Syria
  • United Kingdom
050100150200520122019

How they compare

Syria currently reports 87 days against 86 days in United Kingdom, a difference of 1 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was United Kingdom ahead.

Syria ranks 161st and United Kingdom ranks 163rd of 188 countries.

United Kingdom has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Syria United Kingdom Difference Ahead
2000s 87 days 140 days 53 days United Kingdom
2010s 87 days 90.67 days 3.67 days United Kingdom

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Syria or United Kingdom?
Syria, at 87 days against 86 days in United Kingdom as of 2012.
What is the difference in dealing with construction permits: time between Syria and United Kingdom?
1 days, with Syria ahead.
How many years of comparable data are there for Syria and United Kingdom?
8 years are reported by both, from 2005 to 2012.
How do Syria and United Kingdom rank globally for dealing with construction permits: time?
Syria ranks 161st and United Kingdom ranks 163rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Syria vs United Kingdom: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/syrian-arab-republic/united-kingdom/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/syrian-arab-republic/united-kingdom/">Syria vs United Kingdom: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.