Tanzania vs Zambia: Dealing with construction permits: Time (days) (Time days)

Tanzania
184 days
in 2019
Zambia
188 days
in 2019
Tanzania rank
48th
Zambia rank
46th

Dealing with construction permits: Time (days) (Time days) over time

  • Tanzania
  • Zambia
050100150200250200520122019

How they compare

Zambia currently reports 188 days against 184 days in Tanzania, a difference of 4 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Zambia ahead.

Tanzania ranks 48th and Zambia ranks 46th of 188 countries.

Across the 2 decades both report, Tanzania averaged higher in 1 and Zambia in 1.

Head to head by decade

Decade Tanzania Zambia Difference Ahead
2000s 216 days 216.2 days 0.2 days Zambia
2010s 214.1 days 191.9 days 22.2 days Tanzania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Tanzania or Zambia?
Zambia, at 188 days against 184 days in Tanzania as of 2019.
What is the difference in dealing with construction permits: time between Tanzania and Zambia?
4 days, with Zambia ahead.
How many years of comparable data are there for Tanzania and Zambia?
15 years are reported by both, from 2005 to 2019.
How do Tanzania and Zambia rank globally for dealing with construction permits: time?
Tanzania ranks 48th and Zambia ranks 46th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Tanzania vs Zambia: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/tanzania/zambia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/tanzania/zambia/">Tanzania vs Zambia: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.