Dealing with construction permits: Time in Zambia

Zambia: Dealing with construction permits: Time was 188 days in 2019. ▼ Falling

Latest (2019)
188 days
Change on year
unchanged
World rank
44th
of 185 countries
All-time high
230 days
in 2005
All-time low
188 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in Zambia, 2005–2019

0501001502002502005201220192005: 230 days2006: 230 days2007: 207 days2008: 207 days2009: 207 days2010: 207 days2011: 208 days2012: 188 days2013: 188 days2014: 188 days2015: 188 days2016: 188 days2017: 188 days2018: 188 days2019: 188 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Zambia stood at 188 days. That is the lowest value across all 15 years on record.

The figure is down 9.2% over ten years.

Over the whole period, dealing with construction permits: time in Zambia peaked at 230 days in 2005 and was at its lowest, 188 days, in 2012.

Zambia ranks 44th of 185 countries on this measure, in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 216.2 days 207 days 230 days 5
2010s 191.9 days 188 days 208 days 10

Countries ranked near Zambia

  1. 41 Latvia 192 days compare
  2. 42 Dominica 191 days compare
  3. 43 Italy 189.5 days compare
  4. 45 Kiribati 185 days compare
  5. 46 Angola 184 days compare
  6. 46 Tanzania 184 days compare
  7. 46 Yemen 184 days compare

See the full ranking of 187 places →

More private sector data for Zambia

All data for Zambia →

Frequently asked questions

What is dealing with construction permits: time in Zambia?
Dealing with construction permits: time in Zambia was 188 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Zambia?
The highest recorded value was 230 days in 2005.
What is the lowest dealing with construction permits: time recorded in Zambia?
The lowest recorded value was 188 days in 2012.
How does Zambia rank for dealing with construction permits: time?
Zambia ranks 44th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Zambia?
Over the last ten years it is down 9.2%. The long-run trend across the full record is falling.
Where does this Zambia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.