Thailand vs Uganda: Dealing with construction permits: Time

Thailand
113 days
in 2019
Uganda
113 days
in 2019
Thailand rank
121st
Uganda rank
121st

Dealing with construction permits: Time over time

  • Thailand
  • Uganda
050100150200520122019

How they compare

Thailand currently reports 113 days against 113 days in Uganda, a difference of 0 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Thailand ahead.

Thailand ranks 121st and Uganda ranks 121st of 185 countries.

Thailand has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Thailand Uganda Difference Ahead
2000s 171 days 145 days 26 days Thailand
2010s 138.2 days 130.7 days 7.5 days Thailand

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Thailand or Uganda?
Thailand, at 113 days against 113 days in Uganda as of 2019.
What is the difference in dealing with construction permits: time between Thailand and Uganda?
0 days, with Thailand ahead.
How many years of comparable data are there for Thailand and Uganda?
15 years are reported by both, from 2005 to 2019.
How do Thailand and Uganda rank globally for dealing with construction permits: time?
Thailand ranks 121st and Uganda ranks 121st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.