Tonga vs Ukraine: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Tonga
- Ukraine
How they compare
Tonga currently reports 77 days against 72.5 days in Ukraine, a difference of 4.5 days.
That makes Tonga's figure about 1.1 times Ukraine's.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Ukraine ahead.
Tonga ranks 168th and Ukraine ranks 170th of 185 countries.
Ukraine has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Tonga | Ukraine | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 67.4 days | 540.2 days | 472.8 days | Ukraine |
| 2010s | 68.2 days | 176.75 days | 108.55 days | Ukraine |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Tonga or Ukraine?
- Tonga, at 77 days against 72.5 days in Ukraine as of 2019.
- What is the difference in dealing with construction permits: time between Tonga and Ukraine?
- 4.5 days, with Tonga ahead.
- How many years of comparable data are there for Tonga and Ukraine?
- 15 years are reported by both, from 2005 to 2019.
- How do Tonga and Ukraine rank globally for dealing with construction permits: time?
- Tonga ranks 168th and Ukraine ranks 170th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.