Trinidad and Tobago vs Uruguay: Dealing with construction permits: Time

Trinidad and Tobago
254 days
in 2019
Uruguay
265 days
in 2019
Trinidad and Tobago rank
17th
Uruguay rank
14th

Dealing with construction permits: Time over time

  • Trinidad and Tobago
  • Uruguay
0100200300200520122019

How they compare

Uruguay currently reports 265 days against 254 days in Trinidad and Tobago, a difference of 11 days.

Across all 15 years both countries report, Uruguay has been ahead every year.

Trinidad and Tobago ranks 17th and Uruguay ranks 14th of 185 countries.

Uruguay has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Trinidad and Tobago Uruguay Difference Ahead
2000s 254 days 265 days 11 days Uruguay
2010s 254 days 265 days 11 days Uruguay

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Trinidad and Tobago or Uruguay?
Uruguay, at 265 days against 254 days in Trinidad and Tobago as of 2019.
What is the difference in dealing with construction permits: time between Trinidad and Tobago and Uruguay?
11 days, with Uruguay ahead.
How many years of comparable data are there for Trinidad and Tobago and Uruguay?
15 years are reported by both, from 2005 to 2019.
How do Trinidad and Tobago and Uruguay rank globally for dealing with construction permits: time?
Trinidad and Tobago ranks 17th and Uruguay ranks 14th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.