Ukraine vs United States: Dealing with construction permits: Time

Ukraine
72.5 days
in 2019
United States
80.6 days
in 2019
Ukraine rank
170th
United States rank
167th

Dealing with construction permits: Time over time

  • Ukraine
  • United States
100200300400500600200520122019

How they compare

United States currently reports 80.6 days against 72.5 days in Ukraine, a difference of 8.1 days.

That makes United States's figure about 1.1 times Ukraine's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Ukraine ahead.

Ukraine ranks 170th and United States ranks 167th of 185 countries.

Ukraine has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ukraine United States Difference Ahead
2000s 540.2 days 59 days 481.2 days Ukraine
2010s 176.75 days 83.12 days 93.63 days Ukraine

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Ukraine or United States?
United States, at 80.6 days against 72.5 days in Ukraine as of 2019.
What is the difference in dealing with construction permits: time between Ukraine and United States?
8.1 days, with United States ahead.
How many years of comparable data are there for Ukraine and United States?
15 years are reported by both, from 2005 to 2019.
How do Ukraine and United States rank globally for dealing with construction permits: time?
Ukraine ranks 170th and United States ranks 167th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.