Grenada vs Papua New Guinea: Getting electricity: Minimum outage time (in minutes)

Grenada
5 DB16-20 methodology
in 2019
Papua New Guinea
5 DB16-20 methodology
in 2019
Grenada rank
5th
Papua New Guinea rank
5th

Getting electricity: Minimum outage time (in minutes) over time

  • Grenada
  • Papua New Guinea
012345201420162019

How they compare

Grenada currently reports 5 DB16-20 methodology against 5 DB16-20 methodology in Papua New Guinea, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Papua New Guinea has been ahead every year.

Grenada ranks 5th and Papua New Guinea ranks 5th of 137 countries.

Papua New Guinea has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Grenada or Papua New Guinea?
Grenada, at 5 DB16-20 methodology against 5 DB16-20 methodology in Papua New Guinea as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Grenada and Papua New Guinea?
0 DB16-20 methodology, with Grenada ahead.
How many years of comparable data are there for Grenada and Papua New Guinea?
6 years are reported by both, from 2014 to 2019.
How do Grenada and Papua New Guinea rank globally for getting electricity: minimum outage time (in minutes)?
Grenada ranks 5th and Papua New Guinea ranks 5th of 137 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs Papua New Guinea: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/grenada/papua-new-guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/grenada/papua-new-guinea/">Grenada vs Papua New Guinea: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
137 places, 822 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.