Getting electricity: Minimum outage time (in minutes) in Grenada
Grenada: Getting electricity: Minimum outage time (in minutes) was 5 DB16-20 methodology in 2019. ▲ Rising
Getting electricity: Minimum outage time (in minutes) in Grenada, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: minimum outage time (in minutes) in Grenada stood at 5 DB16-20 methodology. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places Grenada 5th out of 135 countries with data for 2019, putting it in the top 10%.
Countries ranked near Grenada
- 4 Zimbabwe 10 DB16-20 methodology compare
- 5 India 5 DB16-20 methodology compare
- 5 Indonesia 5 DB16-20 methodology compare
- 5 Nigeria 5 DB16-20 methodology compare
- 5 Mexico 5 DB16-20 methodology compare
- 5 Armenia 5 DB16-20 methodology compare
- 5 Barbados 5 DB16-20 methodology compare
- 5 Belize 5 DB16-20 methodology compare
- 5 Bhutan 5 DB16-20 methodology compare
- 5 Costa Rica 5 DB16-20 methodology compare
- 5 Cote d'Ivoire 5 DB16-20 methodology compare
- 5 Cyprus 5 DB16-20 methodology compare
- 5 Dominica 5 DB16-20 methodology compare
- 5 Egypt, Arab Rep. 5 DB16-20 methodology compare
- 5 Eswatini 5 DB16-20 methodology compare
- 5 Fiji 5 DB16-20 methodology compare
- 5 Guyana 5 DB16-20 methodology compare
- 5 Iran, Islamic Rep. 5 DB16-20 methodology compare
- 5 Jamaica 5 DB16-20 methodology compare
- 5 Korea, Rep. 5 DB16-20 methodology compare
- 5 Kuwait 5 DB16-20 methodology compare
- 5 Mauritania 5 DB16-20 methodology compare
- 5 Mongolia 5 DB16-20 methodology compare
- 5 Namibia 5 DB16-20 methodology compare
- 5 Oman 5 DB16-20 methodology compare
- 5 Papua New Guinea 5 DB16-20 methodology compare
- 5 Philippines 5 DB16-20 methodology compare
- 5 Puerto Rico (US) 5 DB16-20 methodology compare
- 5 Qatar 5 DB16-20 methodology compare
- 5 Rwanda 5 DB16-20 methodology compare
- 5 Samoa 5 DB16-20 methodology compare
- 5 Saudi Arabia 5 DB16-20 methodology compare
- 5 South Africa 5 DB16-20 methodology compare
- 5 Sudan 5 DB16-20 methodology compare
- 5 Togo 5 DB16-20 methodology compare
- 5 Tonga 5 DB16-20 methodology compare
- 5 Turkiye 5 DB16-20 methodology compare
- 5 Uganda 5 DB16-20 methodology compare
- 5 United Arab Emirates 5 DB16-20 methodology compare
- 5 Viet Nam 5 DB16-20 methodology compare
- 5 Zambia 5 DB16-20 methodology compare
More private sector data for Grenada
- Merchandise trade 48.4% (2025)
- Food imports 24.2% (2024)
- Manufactures imports 56.2% (2024)
- Merchandise imports 653.00 million current US$ (2025)
- Food exports 69.1% (2024)
- Manufactures exports 28.6% (2024)
- Merchandise exports 35.00 million current US$ (2025)
- Commercial service exports 754.40 million current US$ (2025)
- Transport services 25.0% (2025)
- Computer, communications and other services 58.6% (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Grenada?
- Getting electricity: minimum outage time (in minutes) in Grenada was 5 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Grenada?
- The highest recorded value was 5 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Grenada?
- The lowest recorded value was 2 DB16-20 methodology in 2016.
- How does Grenada rank for getting electricity: minimum outage time (in minutes)?
- Grenada ranks 5th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Grenada?
- Over the last ten years it is unchanged. The long-run trend across the full record is rising.
- Where does this Grenada data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.