Hong Kong, China vs Kenya: Getting electricity: Minimum outage time (in minutes)

Hong Kong, China
1 DB16-20 methodology
in 2019
Kenya
1 DB16-20 methodology
in 2019
Hong Kong, China rank
103rd
Kenya rank
103rd

Getting electricity: Minimum outage time (in minutes) over time

  • Hong Kong, China
  • Kenya
00.20.40.60.81201420162019

How they compare

Hong Kong, China currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Kenya, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Kenya has been ahead every year.

Hong Kong, China ranks 103rd and Kenya ranks 103rd of 137 countries.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Hong Kong, China or Kenya?
Hong Kong, China, at 1 DB16-20 methodology against 1 DB16-20 methodology in Kenya as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Hong Kong, China and Kenya?
0 DB16-20 methodology, with Hong Kong, China ahead.
How many years of comparable data are there for Hong Kong, China and Kenya?
6 years are reported by both, from 2014 to 2019.
How do Hong Kong, China and Kenya rank globally for getting electricity: minimum outage time (in minutes)?
Hong Kong, China ranks 103rd and Kenya ranks 103rd of 137 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong, China vs Kenya: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/hong-kong-sar-china/kenya/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/hong-kong-sar-china/kenya/">Hong Kong, China vs Kenya: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
137 places, 822 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.