Getting electricity: Minimum outage time (in minutes) in Kenya
Kenya: Getting electricity: Minimum outage time (in minutes) was 1 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Kenya, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Kenya recorded 1 DB16-20 methodology for getting electricity: minimum outage time (in minutes) in 2019. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
That places Kenya 103rd out of 135 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Kenya
- 103 Russia 1 DB16-20 methodology compare
- 103 Japan 1 DB16-20 methodology compare
- 103 Antigua and Barbuda 1 DB16-20 methodology compare
- 103 Bahrain 1 DB16-20 methodology compare
- 103 Brunei 1 DB16-20 methodology compare
- 103 Cambodia 1 DB16-20 methodology compare
- 103 Canada 1 DB16-20 methodology compare
- 103 Denmark 1 DB16-20 methodology compare
- 103 Hong Kong 1 DB16-20 methodology compare
- 103 Israel 1 DB16-20 methodology compare
- 103 Kazakhstan 1 DB16-20 methodology compare
- 103 Malaysia 1 DB16-20 methodology compare
- 103 Morocco 1 DB16-20 methodology compare
- 103 New Zealand 1 DB16-20 methodology compare
- 103 Niger 1 DB16-20 methodology compare
- 103 San Marino 1 DB16-20 methodology compare
- 103 Seychelles 1 DB16-20 methodology compare
- 103 Taiwan 1 DB16-20 methodology compare
- 103 Thailand 1 DB16-20 methodology compare
- 103 Palestine 1 DB16-20 methodology compare
More private sector data for Kenya
- Merchandise trade 22.2% (2025)
- Food imports 16.3% (2024)
- Manufactures imports 56.6% (2024)
- Merchandise imports 21.61 billion current US$ (2025)
- Food exports 49.2% (2024)
- Manufactures exports 30.7% (2024)
- Merchandise exports 8.60 billion current US$ (2025)
- Commercial service exports 7.49 billion current US$ (2024)
- Transport services 34.6% (2024)
- Computer, communications and other services 35.1% (2024)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Kenya?
- Getting electricity: minimum outage time (in minutes) in Kenya was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Kenya?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Kenya?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Kenya rank for getting electricity: minimum outage time (in minutes)?
- Kenya ranks 103rd out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Kenya?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Kenya data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.