Tanzania, United Republic of vs Uruguay: Getting electricity: Minimum outage time (in minutes)

Tanzania, United Republic of
4 DB16-20 methodology
in 2019
Uruguay
3 DB16-20 methodology
in 2019
Tanzania, United Republic of rank
47th
Uruguay rank
48th

Getting electricity: Minimum outage time (in minutes) over time

  • Tanzania, United Republic of
  • Uruguay
01234201420162019

How they compare

Tanzania, United Republic of currently reports 4 DB16-20 methodology against 3 DB16-20 methodology in Uruguay, a difference of 1 DB16-20 methodology.

That makes Tanzania, United Republic of's figure about 1.3 times Uruguay's.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Uruguay ahead.

Tanzania, United Republic of ranks 47th and Uruguay ranks 48th of 136 countries.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Tanzania, United Republic of or Uruguay?
Tanzania, United Republic of, at 4 DB16-20 methodology against 3 DB16-20 methodology in Uruguay as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Tanzania, United Republic of and Uruguay?
1 DB16-20 methodology, with Tanzania, United Republic of ahead.
How many years of comparable data are there for Tanzania, United Republic of and Uruguay?
6 years are reported by both, from 2014 to 2019.
How do Tanzania, United Republic of and Uruguay rank globally for getting electricity: minimum outage time (in minutes)?
Tanzania, United Republic of ranks 47th and Uruguay ranks 48th of 136 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Tanzania, United Republic of vs Uruguay: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 23 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/tanzania/uruguay/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/tanzania/uruguay/">Tanzania, United Republic of vs Uruguay: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
136 places, 816 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.