Getting electricity: Minimum outage time (in minutes) in Uruguay
Uruguay: Getting electricity: Minimum outage time (in minutes) was 3 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Uruguay, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: minimum outage time (in minutes) in Uruguay stood at 3 DB16-20 methodology. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
That places Uruguay 48th out of 135 countries with data for 2019, putting it in the middle of the range.
Countries ranked near Uruguay
- 46 United States 4.2 DB16-20 methodology compare
- 47 Tanzania 4 DB16-20 methodology compare
- 48 China 3 DB16-20 methodology compare
- 48 Pakistan 3 DB16-20 methodology compare
- 48 Brazil 3 DB16-20 methodology compare
- 48 Algeria 3 DB16-20 methodology compare
- 48 Argentina 3 DB16-20 methodology compare
- 48 Australia 3 DB16-20 methodology compare
- 48 Austria 3 DB16-20 methodology compare
- 48 Azerbaijan 3 DB16-20 methodology compare
- 48 Belgium 3 DB16-20 methodology compare
- 48 Bolivia 3 DB16-20 methodology compare
- 48 Bosnia and Herzegovina 3 DB16-20 methodology compare
- 48 Bulgaria 3 DB16-20 methodology compare
- 48 Chile 3 DB16-20 methodology compare
- 48 Colombia 3 DB16-20 methodology compare
- 48 Croatia 3 DB16-20 methodology compare
- 48 Czechia 3 DB16-20 methodology compare
- 48 Dominican Republic 3 DB16-20 methodology compare
- 48 Ecuador 3 DB16-20 methodology compare
- 48 El Salvador 3 DB16-20 methodology compare
- 48 Estonia 3 DB16-20 methodology compare
- 48 France 3 DB16-20 methodology compare
- 48 Georgia 3 DB16-20 methodology compare
- 48 Germany 3 DB16-20 methodology compare
- 48 Greece 3 DB16-20 methodology compare
- 48 Guatemala 3 DB16-20 methodology compare
- 48 Hungary 3 DB16-20 methodology compare
- 48 Ireland 3 DB16-20 methodology compare
- 48 Italy 3 DB16-20 methodology compare
- 48 Latvia 3 DB16-20 methodology compare
- 48 Lithuania 3 DB16-20 methodology compare
- 48 Mauritius 3 DB16-20 methodology compare
- 48 Moldova 3 DB16-20 methodology compare
- 48 Nicaragua 3 DB16-20 methodology compare
- 48 North Macedonia 3 DB16-20 methodology compare
- 48 Norway 3 DB16-20 methodology compare
- 48 Panama 3 DB16-20 methodology compare
- 48 Paraguay 3 DB16-20 methodology compare
- 48 Peru 3 DB16-20 methodology compare
- 48 Poland 3 DB16-20 methodology compare
- 48 Portugal 3 DB16-20 methodology compare
- 48 Romania 3 DB16-20 methodology compare
- 48 Serbia 3 DB16-20 methodology compare
- 48 Slovakia 3 DB16-20 methodology compare
- 48 Slovenia 3 DB16-20 methodology compare
- 48 Spain 3 DB16-20 methodology compare
- 48 Sweden 3 DB16-20 methodology compare
- 48 Switzerland 3 DB16-20 methodology compare
- 48 Ukraine 3 DB16-20 methodology compare
- 48 United Kingdom 3 DB16-20 methodology compare
- 48 Vanuatu 3 DB16-20 methodology compare
More private sector data for Uruguay
- Merchandise trade 28.3% (2025)
- Food imports 14.1% (2024)
- Manufactures imports 69.6% (2024)
- Merchandise imports 12.95 billion current US$ (2025)
- Food exports 65.3% (2024)
- Manufactures exports 18.9% (2024)
- Merchandise exports 11.23 billion current US$ (2025)
- Commercial service exports 7.32 billion current US$ (2025)
- Transport services 28.5% (2025)
- Computer, communications and other services 43.8% (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Uruguay?
- Getting electricity: minimum outage time (in minutes) in Uruguay was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Uruguay?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Uruguay?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Uruguay rank for getting electricity: minimum outage time (in minutes)?
- Uruguay ranks 48th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Uruguay?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Uruguay data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.