Viet Nam vs Zimbabwe: Getting electricity: Minimum outage time (in minutes)

Viet Nam
5 DB16-20 methodology
in 2019
Zimbabwe
10 DB16-20 methodology
in 2019
Viet Nam rank
5th
Zimbabwe rank
4th

Getting electricity: Minimum outage time (in minutes) over time

  • Viet Nam
  • Zimbabwe
0246810201420162019

How they compare

Zimbabwe currently reports 10 DB16-20 methodology against 5 DB16-20 methodology in Viet Nam, a difference of 5 DB16-20 methodology.

That makes Zimbabwe's figure about 2.0 times Viet Nam's.

Across all 6 years both countries report, Zimbabwe has been ahead every year.

Viet Nam ranks 5th and Zimbabwe ranks 4th of 137 countries.

Zimbabwe has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity: minimum outage time (in minutes), Viet Nam or Zimbabwe?
Zimbabwe, at 10 DB16-20 methodology against 5 DB16-20 methodology in Viet Nam as of 2019.
What is the difference in getting electricity: minimum outage time (in minutes) between Viet Nam and Zimbabwe?
5 DB16-20 methodology, with Zimbabwe ahead.
How many years of comparable data are there for Viet Nam and Zimbabwe?
6 years are reported by both, from 2014 to 2019.
How do Viet Nam and Zimbabwe rank globally for getting electricity: minimum outage time (in minutes)?
Viet Nam ranks 5th and Zimbabwe ranks 4th of 137 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Viet Nam vs Zimbabwe: Getting electricity: Minimum outage time (in minutes). Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/viet-nam/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-minimum-outage-time-in-minutes-db16-20-methodology/viet-nam/zimbabwe/">Viet Nam vs Zimbabwe: Getting electricity: Minimum outage time (in minutes)</a> — Statizoid

About this data

Indicator
Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
137 places, 822 data points, 2014–2019
Last refreshed

The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.