Getting electricity: Minimum outage time (in minutes) in Zimbabwe
Zimbabwe: Getting electricity: Minimum outage time (in minutes) was 10 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Zimbabwe, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: minimum outage time (in minutes) in Zimbabwe stood at 10 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Zimbabwe ranks 4th of 135 countries on this measure, in the top 10%.
Countries ranked near Zimbabwe
- 1 Marshall Islands 30 DB16-20 methodology compare
- 1 Palau 30 DB16-20 methodology compare
- 1 Suriname 30 DB16-20 methodology compare
- 5 India 5 DB16-20 methodology compare
- 5 Indonesia 5 DB16-20 methodology compare
- 5 Nigeria 5 DB16-20 methodology compare
- 5 Mexico 5 DB16-20 methodology compare
- 5 Armenia 5 DB16-20 methodology compare
- 5 Barbados 5 DB16-20 methodology compare
- 5 Belize 5 DB16-20 methodology compare
- 5 Bhutan 5 DB16-20 methodology compare
- 5 Costa Rica 5 DB16-20 methodology compare
- 5 Cote d'Ivoire 5 DB16-20 methodology compare
- 5 Cyprus 5 DB16-20 methodology compare
- 5 Dominica 5 DB16-20 methodology compare
- 5 Egypt 5 DB16-20 methodology compare
- 5 Eswatini 5 DB16-20 methodology compare
- 5 Fiji 5 DB16-20 methodology compare
- 5 Grenada 5 DB16-20 methodology compare
- 5 Guyana 5 DB16-20 methodology compare
- 5 Iran 5 DB16-20 methodology compare
- 5 Jamaica 5 DB16-20 methodology compare
- 5 South Korea 5 DB16-20 methodology compare
- 5 Kuwait 5 DB16-20 methodology compare
- 5 Mauritania 5 DB16-20 methodology compare
- 5 Mongolia 5 DB16-20 methodology compare
- 5 Namibia 5 DB16-20 methodology compare
- 5 Oman 5 DB16-20 methodology compare
- 5 Papua New Guinea 5 DB16-20 methodology compare
- 5 Philippines 5 DB16-20 methodology compare
- 5 Puerto Rico 5 DB16-20 methodology compare
- 5 Qatar 5 DB16-20 methodology compare
- 5 Rwanda 5 DB16-20 methodology compare
- 5 Samoa 5 DB16-20 methodology compare
- 5 Saudi Arabia 5 DB16-20 methodology compare
- 5 South Africa 5 DB16-20 methodology compare
- 5 Sudan 5 DB16-20 methodology compare
- 5 Togo 5 DB16-20 methodology compare
- 5 Tonga 5 DB16-20 methodology compare
- 5 Turkey 5 DB16-20 methodology compare
- 5 Uganda 5 DB16-20 methodology compare
- 5 United Arab Emirates 5 DB16-20 methodology compare
- 5 Vietnam 5 DB16-20 methodology compare
- 5 Zambia 5 DB16-20 methodology compare
More private sector data for Zimbabwe
- Merchandise trade 38.7% (2025)
- Food imports 19.0% (2024)
- Manufactures imports 58.3% (2024)
- Merchandise imports 10.11 billion current US$ (2025)
- Food exports 21.6% (2024)
- Manufactures exports 6.7% (2024)
- Merchandise exports 9.71 billion current US$ (2025)
- Commercial service exports 438.49 million current US$ (2024)
- Transport services 34.1% (2024)
- Computer, communications and other services 37.1% (2024)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Zimbabwe?
- Getting electricity: minimum outage time (in minutes) in Zimbabwe was 10 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Zimbabwe?
- The highest recorded value was 10 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Zimbabwe?
- The lowest recorded value was 10 DB16-20 methodology in 2014.
- How does Zimbabwe rank for getting electricity: minimum outage time (in minutes)?
- Zimbabwe ranks 4th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Zimbabwe?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Zimbabwe data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.