Africa vs Mozambique: Time required to deal with construction permits
Africa
193.58 days
in 2012
Mozambique
377 days
in 2012
Africa rank
5th
Mozambique rank
3rd
Time required to deal with construction permits over time
- Africa
- Mozambique
How they compare
Mozambique currently reports 377 days against 193.58 days in Africa, a difference of 183.42 days.
That makes Mozambique's figure about 1.9 times Africa's.
Across all 8 years both countries report, Mozambique has been ahead every year.
Africa ranks 5th and Mozambique ranks 3rd of 6 groups.
Mozambique has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Africa | Mozambique | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 219.12 days | 377 days | 157.88 days | Mozambique |
| 2010s | 196.25 days | 377 days | 180.75 days | Mozambique |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Africa or Mozambique?
- Mozambique, at 377 days against 193.58 days in Africa as of 2012.
- What is the difference in time required to deal with construction permits between Africa and Mozambique?
- 183.42 days, with Mozambique ahead.
- How many years of comparable data are there for Africa and Mozambique?
- 8 years are reported by both, from 2005 to 2012.
- How do Africa and Mozambique rank globally for time required to deal with construction permits?
- Africa ranks 5th and Mozambique ranks 3rd of 6 groups.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.