Time required to deal with construction permits in Africa

Africa: Time required to deal with construction permits was 193.58 days in 2012. ▼ Falling

Latest (2012)
193.58 days
Change on year
down 1.0%
Rank
5th
of 6 groups
All-time high
223.08 days
in 2006
All-time low
193.58 days
in 2012
Years of data
8
2005–2012

Time required to deal with construction permits in Africa, 2005–2012

0501001502002005200820122005: 219.4 days2006: 223.1 days2007: 221.9 days2008: 220.7 days2009: 210.5 days2010: 199.6 days2011: 195.6 days2012: 193.6 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Africa stood at 193.58 days. That is the lowest value across all 8 years on record.

The figure is down 1.0% on the previous year and down 11.8% over ten years.

Averages by decade

DecadeAverage LowestHighest Years
2000s 219.12 days 210.54 days 223.08 days 5
2010s 196.25 days 193.58 days 199.58 days 3

Countries ranked near Africa

  1. 2 Cote d'Ivoire 475 days compare
  2. 3 Mozambique 377 days compare
  3. 4 Angola 348 days compare
  4. 5 Lesotho 330 days compare
  5. 6 Niger 326 days compare
  6. 7 Togo 309 days compare
  7. 8 Benin 282 days compare

See the full ranking of 56 places →

More private sector data for Africa

All data for Africa →

Frequently asked questions

What is time required to deal with construction permits in Africa?
Time required to deal with construction permits in Africa was 193.58 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Africa?
The highest recorded value was 223.08 days in 2006.
What is the lowest time required to deal with construction permits recorded in Africa?
The lowest recorded value was 193.58 days in 2012.
How does Africa rank for time required to deal with construction permits?
Africa ranks 5th out of 6 groups with data for 2012.
Is time required to deal with construction permits rising or falling in Africa?
Over the last ten years it is down 11.8%. The long-run trend across the full record is falling.
Where does this Africa data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.