Africa vs Niger: Time required to deal with construction permits

Africa
193.58 days
in 2012
Niger
326 days
in 2012
Africa rank
5th
Niger rank
6th

Time required to deal with construction permits over time

  • Africa
  • Niger
0100200300200520082012

How they compare

Niger currently reports 326 days against 193.58 days in Africa, a difference of 132.42 days.

That makes Niger's figure about 1.7 times Africa's.

Across all 8 years both countries report, Niger has been ahead every year.

Africa ranks 5th and Niger ranks 6th of 6 groups.

Niger has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Africa Niger Difference Ahead
2000s 219.12 days 327.8 days 108.68 days Niger
2010s 196.25 days 326 days 129.75 days Niger

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Africa or Niger?
Niger, at 326 days against 193.58 days in Africa as of 2012.
What is the difference in time required to deal with construction permits between Africa and Niger?
132.42 days, with Niger ahead.
How many years of comparable data are there for Africa and Niger?
8 years are reported by both, from 2005 to 2012.
How do Africa and Niger rank globally for time required to deal with construction permits?
Africa ranks 5th and Niger ranks 6th of 6 groups.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Africa vs Niger: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/africa/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/africa/niger/">Africa vs Niger: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.