Time required to deal with construction permits (days) in Niger
Niger: Time required to deal with construction permits (days) was 326 days in 2012. ▬ Flat
Time required to deal with construction permits in Niger, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
In 2012, time required to deal with construction permits in Niger stood at 326 days. That is the lowest value across all 8 years on record.
That represents a change of down 2.7% over ten years.
That places Niger 6th out of 50 countries with data for 2012, putting it in the top quarter.
Time required to deal with construction permits (days) in Niger, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 335 days | — |
| 2006 | 326 days | -2.7% |
| 2007 | 326 days | +0.0% |
| 2008 | 326 days | +0.0% |
| 2009 | 326 days | +0.0% |
| 2010 | 326 days | +0.0% |
| 2011 | 326 days | +0.0% |
| 2012 | 326 days | +0.0% |
Niger compared with similar countries
- Niger's 326 days is above the median for low income countries, which is 163.5 days, 2.0× the median. (18 countries reporting)
- Niger's 326 days is above the median for Sub-Saharan Africa, which is 164 days, 2.0× the median. (45 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 327.8 days | 326 days | 335 days | 5 |
| 2010s | 326 days | 326 days | 326 days | 3 |
Countries ranked near Niger
More private sector data for Niger
- Merchandise trade 21.3% (2025)
- Food imports 37.9% (2024)
- Manufactures imports 47.5% (2024)
- Merchandise imports 2.70 billion current US$ (2025)
- Commercial service imports 1.02 billion current US$ (2024)
- Food exports 4.1% (2024)
- Manufactures exports 7.3% (2024)
- Merchandise exports 1.90 billion current US$ (2025)
- Commercial service exports 221.76 million current US$ (2024)
- Merchandise exports (current US$), per capita 68.06 current US$ per person (2025)
Frequently asked questions
- What is time required to deal with construction permits in Niger?
- Time required to deal with construction permits in Niger was 326 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Niger?
- The highest recorded value was 335 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Niger?
- The lowest recorded value was 326 days in 2006.
- How does Niger rank for time required to deal with construction permits?
- Niger ranks 6th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Niger?
- Over the last ten years it is down 2.7%. The long-run trend across the full record is flat.
- Where does this Niger data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.