Time required to deal with construction permits in Niger

Niger: Time required to deal with construction permits was 326 days in 2012. ▬ Flat

Latest (2012)
326 days
Change on year
unchanged
World rank
6th
of 50 countries
All-time high
335 days
in 2005
All-time low
326 days
in 2006
Years of data
8
2005–2012

Time required to deal with construction permits in Niger, 2005–2012

01002003002005200820122005: 335 days2006: 326 days2007: 326 days2008: 326 days2009: 326 days2010: 326 days2011: 326 days2012: 326 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Niger stood at 326 days. That is the lowest value across all 8 years on record.

That represents a change of down 2.7% over ten years.

That places Niger 6th out of 50 countries with data for 2012, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 327.8 days 326 days 335 days 5
2010s 326 days 326 days 326 days 3

Countries ranked near Niger

  1. 3 Mozambique 377 days compare
  2. 4 Angola 348 days compare
  3. 5 Lesotho 330 days compare
  4. 7 Togo 309 days compare
  5. 8 Benin 282 days compare
  6. 9 Algeria 281 days compare

See the full ranking of 56 places →

More private sector data for Niger

All data for Niger →

Frequently asked questions

What is time required to deal with construction permits in Niger?
Time required to deal with construction permits in Niger was 326 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Niger?
The highest recorded value was 335 days in 2005.
What is the lowest time required to deal with construction permits recorded in Niger?
The lowest recorded value was 326 days in 2006.
How does Niger rank for time required to deal with construction permits?
Niger ranks 6th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Niger?
Over the last ten years it is down 2.7%. The long-run trend across the full record is flat.
Where does this Niger data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.