Algeria vs Benin: Time required to deal with construction permits
Algeria
281 days
in 2012
Benin
282 days
in 2012
Algeria rank
9th
Benin rank
8th
Time required to deal with construction permits over time
- Algeria
- Benin
How they compare
Benin currently reports 282 days against 281 days in Algeria, a difference of 1 days.
Across all 8 years both countries report, Benin has been ahead every year.
Algeria ranks 9th and Benin ranks 8th of 50 countries.
Benin has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Algeria | Benin | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 281 days | 415.2 days | 134.2 days | Benin |
| 2010s | 281 days | 342 days | 61 days | Benin |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Algeria or Benin?
- Benin, at 282 days against 281 days in Algeria as of 2012.
- What is the difference in time required to deal with construction permits between Algeria and Benin?
- 1 days, with Benin ahead.
- How many years of comparable data are there for Algeria and Benin?
- 8 years are reported by both, from 2005 to 2012.
- How do Algeria and Benin rank globally for time required to deal with construction permits?
- Algeria ranks 9th and Benin ranks 8th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.