Time required to deal with construction permits (days) in Benin

Benin: Time required to deal with construction permits (days) was 282 days in 2012. ▼ Falling

Latest (2012)
282 days
Change on year
down 24.2%
World rank
8th
of 50 countries
All-time high
462 days
in 2008
All-time low
282 days
in 2012
Years of data
8
2005–2012

Time required to deal with construction permits in Benin, 2005–2012

01002003004005002005200820122005: 384 days2006: 384 days2007: 384 days2008: 462 days2009: 462 days2010: 372 days2011: 372 days2012: 282 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Benin recorded 282 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

The figure is down 24.2% on the previous year and down 26.6% over ten years.

Benin ranks 8th of 50 countries on this measure, in the top quarter.

Time required to deal with construction permits (days) in Benin, year by year

Annual values for Time required to deal with construction permits (days) in Benin, 2005 to 2012.
Year days Change
2005 384 days —
2006 384 days +0.0%
2007 384 days +0.0%
2008 462 days +20.3%
2009 462 days +0.0%
2010 372 days -19.5%
2011 372 days +0.0%
2012 282 days -24.2%

Benin compared with similar countries

  • Benin's 282 days is above the median for lower middle income countries, which is 196.5 days, 1.4× the median. (24 countries reporting)
  • Benin's 282 days is above the median for Sub-Saharan Africa, which is 164 days, 1.7× the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 415.2 days 384 days 462 days 5
2010s 342 days 282 days 372 days 3

Countries ranked near Benin

  1. 5 Lesotho 330 days compare
  2. 6 Niger 326 days compare
  3. 7 Togo 309 days compare
  4. 9 Algeria 281 days compare
  5. 10 Sudan 270 days compare
  6. 11 Gabon 243 days compare

See the full ranking of 56 places →

More private sector data for Benin

All data for Benin →

Frequently asked questions

What is time required to deal with construction permits in Benin?
Time required to deal with construction permits in Benin was 282 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Benin?
The highest recorded value was 462 days in 2008.
What is the lowest time required to deal with construction permits recorded in Benin?
The lowest recorded value was 282 days in 2012.
How does Benin rank for time required to deal with construction permits?
Benin ranks 8th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Benin?
Over the last ten years it is down 26.6%. The long-run trend across the full record is falling.
Where does this Benin data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Benin. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/benin/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/benin/">Time required to deal with construction permits in Benin</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.