Time required to deal with construction permits (days) in Algeria

Algeria: Time required to deal with construction permits (days) was 281 days in 2012. ▬ Flat

Latest (2012)
281 days
Change on year
unchanged
World rank
9th
of 50 countries
All-time high
281 days
in 2005
All-time low
281 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Algeria, 2005–2012

01002003002005200820122005: 281 days2006: 281 days2007: 281 days2008: 281 days2009: 281 days2010: 281 days2011: 281 days2012: 281 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Algeria stood at 281 days. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

Algeria ranks 9th of 50 countries on this measure, in the top quarter.

Time required to deal with construction permits (days) in Algeria, year by year

Annual values for Time required to deal with construction permits (days) in Algeria, 2005 to 2012.
Year days Change
2005 281 days —
2006 281 days +0.0%
2007 281 days +0.0%
2008 281 days +0.0%
2009 281 days +0.0%
2010 281 days +0.0%
2011 281 days +0.0%
2012 281 days +0.0%

Algeria compared with similar countries

  • Algeria's 281 days is above the median for upper middle income countries, which is 145 days, 1.9× the median. (7 countries reporting)
  • Algeria's 281 days is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 172 days, 1.6× the median. (5 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 281 days 281 days 281 days 5
2010s 281 days 281 days 281 days 3

Countries ranked near Algeria

  1. 6 Niger 326 days compare
  2. 7 Togo 309 days compare
  3. 8 Benin 282 days compare
  4. 10 Sudan 270 days compare
  5. 11 Gabon 243 days compare
  6. 12 Sierra Leone 238 days compare

See the full ranking of 56 places →

More private sector data for Algeria

All data for Algeria →

Frequently asked questions

What is time required to deal with construction permits in Algeria?
Time required to deal with construction permits in Algeria was 281 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Algeria?
The highest recorded value was 281 days in 2005.
What is the lowest time required to deal with construction permits recorded in Algeria?
The lowest recorded value was 281 days in 2005.
How does Algeria rank for time required to deal with construction permits?
Algeria ranks 9th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Algeria?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Algeria data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Algeria. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/algeria/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/algeria/">Time required to deal with construction permits in Algeria</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.