Algeria vs Gabon: Time required to deal with construction permits

Algeria
281 days
in 2012
Gabon
243 days
in 2012
Algeria rank
9th
Gabon rank
11th

Time required to deal with construction permits over time

  • Algeria
  • Gabon
0100200300200520082012

How they compare

Algeria currently reports 281 days against 243 days in Gabon, a difference of 38 days.

That makes Algeria's figure about 1.2 times Gabon's.

Across all 8 years both countries report, Algeria has been ahead every year.

Algeria ranks 9th and Gabon ranks 11th of 50 countries.

Algeria has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Algeria Gabon Difference Ahead
2000s 281 days 243 days 38 days Algeria
2010s 281 days 243 days 38 days Algeria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Algeria or Gabon?
Algeria, at 281 days against 243 days in Gabon as of 2012.
What is the difference in time required to deal with construction permits between Algeria and Gabon?
38 days, with Algeria ahead.
How many years of comparable data are there for Algeria and Gabon?
8 years are reported by both, from 2005 to 2012.
How do Algeria and Gabon rank globally for time required to deal with construction permits?
Algeria ranks 9th and Gabon ranks 11th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Algeria vs Gabon: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/algeria/gabon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/algeria/gabon/">Algeria vs Gabon: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.