Algeria vs Gabon: Time required to deal with construction permits
Algeria
281 days
in 2012
Gabon
243 days
in 2012
Algeria rank
9th
Gabon rank
11th
Time required to deal with construction permits over time
- Algeria
- Gabon
How they compare
Algeria currently reports 281 days against 243 days in Gabon, a difference of 38 days.
That makes Algeria's figure about 1.2 times Gabon's.
Across all 8 years both countries report, Algeria has been ahead every year.
Algeria ranks 9th and Gabon ranks 11th of 50 countries.
Algeria has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Algeria | Gabon | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 281 days | 243 days | 38 days | Algeria |
| 2010s | 281 days | 243 days | 38 days | Algeria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Algeria or Gabon?
- Algeria, at 281 days against 243 days in Gabon as of 2012.
- What is the difference in time required to deal with construction permits between Algeria and Gabon?
- 38 days, with Algeria ahead.
- How many years of comparable data are there for Algeria and Gabon?
- 8 years are reported by both, from 2005 to 2012.
- How do Algeria and Gabon rank globally for time required to deal with construction permits?
- Algeria ranks 9th and Gabon ranks 11th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.