Algeria vs Sudan: Time required to deal with construction permits
Algeria
281 days
in 2012
Sudan
270 days
in 2012
Algeria rank
9th
Sudan rank
10th
Time required to deal with construction permits over time
- Algeria
- Sudan
How they compare
Algeria currently reports 281 days against 270 days in Sudan, a difference of 11 days.
Across all 8 years both countries report, Algeria has been ahead every year.
Algeria ranks 9th and Sudan ranks 10th of 50 countries.
Algeria has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Algeria | Sudan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 281 days | 270 days | 11 days | Algeria |
| 2010s | 281 days | 270 days | 11 days | Algeria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Algeria or Sudan?
- Algeria, at 281 days against 270 days in Sudan as of 2012.
- What is the difference in time required to deal with construction permits between Algeria and Sudan?
- 11 days, with Algeria ahead.
- How many years of comparable data are there for Algeria and Sudan?
- 8 years are reported by both, from 2005 to 2012.
- How do Algeria and Sudan rank globally for time required to deal with construction permits?
- Algeria ranks 9th and Sudan ranks 10th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.