Time required to deal with construction permits in Sudan

Sudan: Time required to deal with construction permits was 270 days in 2012. ▬ Flat

Latest (2012)
270 days
Change on year
unchanged
World rank
10th
of 50 countries
All-time high
270 days
in 2005
All-time low
270 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Sudan, 2005–2012

01002003002005200820122005: 270 days2006: 270 days2007: 270 days2008: 270 days2009: 270 days2010: 270 days2011: 270 days2012: 270 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Sudan recorded 270 days for time required to deal with construction permits in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Sudan 10th out of 50 countries with data for 2012, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 270 days 270 days 270 days 5
2010s 270 days 270 days 270 days 3

Countries ranked near Sudan

  1. 7 Togo 309 days compare
  2. 8 Benin 282 days compare
  3. 9 Algeria 281 days compare
  4. 11 Gabon 243 days compare
  5. 12 Sierra Leone 238 days compare
  6. 13 Egypt 218 days compare
  7. 13 Ghana 218 days compare

See the full ranking of 56 places →

More private sector data for Sudan

All data for Sudan →

Frequently asked questions

What is time required to deal with construction permits in Sudan?
Time required to deal with construction permits in Sudan was 270 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Sudan?
The highest recorded value was 270 days in 2005.
What is the lowest time required to deal with construction permits recorded in Sudan?
The lowest recorded value was 270 days in 2005.
How does Sudan rank for time required to deal with construction permits?
Sudan ranks 10th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Sudan?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Sudan data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.