Algeria vs Togo: Time required to deal with construction permits

Algeria
281 days
in 2012
Togo
309 days
in 2012
Algeria rank
9th
Togo rank
7th

Time required to deal with construction permits over time

  • Algeria
  • Togo
0100200300200520082012

How they compare

Togo currently reports 309 days against 281 days in Algeria, a difference of 28 days.

That makes Togo's figure about 1.1 times Algeria's.

Across all 8 years both countries report, Togo has been ahead every year.

Algeria ranks 9th and Togo ranks 7th of 50 countries.

Togo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Algeria Togo Difference Ahead
2000s 281 days 309 days 28 days Togo
2010s 281 days 309 days 28 days Togo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Algeria or Togo?
Togo, at 309 days against 281 days in Algeria as of 2012.
What is the difference in time required to deal with construction permits between Algeria and Togo?
28 days, with Togo ahead.
How many years of comparable data are there for Algeria and Togo?
8 years are reported by both, from 2005 to 2012.
How do Algeria and Togo rank globally for time required to deal with construction permits?
Algeria ranks 9th and Togo ranks 7th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Algeria vs Togo: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/algeria/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/algeria/togo/">Algeria vs Togo: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.