Time required to deal with construction permits (days) in Togo
Togo: Time required to deal with construction permits (days) was 309 days in 2012. ▬ Flat
Latest (2012)
309 days
Change on year
unchanged
World rank
7th
of 50 countries
All-time high
309 days
in 2005
All-time low
309 days
in 2005
Years of data
8
2005–2012
Time required to deal with construction permits in Togo, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
In 2012, time required to deal with construction permits in Togo stood at 309 days. That is the highest value across all 8 years on record.
The figure is unchanged over ten years.
Togo ranks 7th of 50 countries on this measure, in the top quarter.
Time required to deal with construction permits (days) in Togo, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 309 days | — |
| 2006 | 309 days | +0.0% |
| 2007 | 309 days | +0.0% |
| 2008 | 309 days | +0.0% |
| 2009 | 309 days | +0.0% |
| 2010 | 309 days | +0.0% |
| 2011 | 309 days | +0.0% |
| 2012 | 309 days | +0.0% |
Togo compared with similar countries
- Togo's 309 days is above the median for lower middle income countries, which is 196.5 days, 1.6× the median. (24 countries reporting)
- Togo's 309 days is above the median for Sub-Saharan Africa, which is 164 days, 1.9× the median. (45 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 309 days | 309 days | 309 days | 5 |
| 2010s | 309 days | 309 days | 309 days | 3 |
Countries ranked near Togo
More private sector data for Togo
- Merchandise trade 43.7% (2025)
- Food imports 20.6% (2025)
- Manufactures imports 69.0% (2025)
- Merchandise imports 3.40 billion current US$ (2025)
- Commercial service imports 435.35 million current US$ (2020)
- Food exports 34.4% (2025)
- Manufactures exports 35.0% (2025)
- Merchandise exports 1.80 billion current US$ (2025)
- Commercial service exports 479.01 million current US$ (2020)
- Merchandise exports (current US$), per capita 209.51 current US$ per person (2025)
Frequently asked questions
- What is time required to deal with construction permits in Togo?
- Time required to deal with construction permits in Togo was 309 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Togo?
- The highest recorded value was 309 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Togo?
- The lowest recorded value was 309 days in 2005.
- How does Togo rank for time required to deal with construction permits?
- Togo ranks 7th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Togo?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Togo data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.