Angola vs Côte d'Ivoire: Time required to deal with construction permits

Angola
348 days
in 2012
Côte d'Ivoire
475 days
in 2012
Angola rank
4th
Côte d'Ivoire rank
2nd

Time required to deal with construction permits over time

  • Angola
  • Côte d'Ivoire
0200400600200520082012

How they compare

Côte d'Ivoire currently reports 475 days against 348 days in Angola, a difference of 127 days.

That makes Côte d'Ivoire's figure about 1.4 times Angola's.

Across all 8 years both countries report, Côte d'Ivoire has been ahead every year.

Angola ranks 4th and Côte d'Ivoire ranks 2nd of 50 countries.

Côte d'Ivoire has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Angola Côte d'Ivoire Difference Ahead
2000s 321 days 534.2 days 213.2 days Côte d'Ivoire
2010s 330 days 475 days 145 days Côte d'Ivoire

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Angola or Côte d'Ivoire?
Côte d'Ivoire, at 475 days against 348 days in Angola as of 2012.
What is the difference in time required to deal with construction permits between Angola and Côte d'Ivoire?
127 days, with Côte d'Ivoire ahead.
How many years of comparable data are there for Angola and Côte d'Ivoire?
8 years are reported by both, from 2005 to 2012.
How do Angola and Côte d'Ivoire rank globally for time required to deal with construction permits?
Angola ranks 4th and Côte d'Ivoire ranks 2nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Angola vs Côte d'Ivoire: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 30 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/angola/cote-d-ivoire/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/angola/cote-d-ivoire/">Angola vs Côte d'Ivoire: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.