Angola vs Lesotho: Time required to deal with construction permits

Angola
348 days
in 2012
Lesotho
330 days
in 2012
Angola rank
4th
Lesotho rank
5th

Time required to deal with construction permits over time

  • Angola
  • Lesotho
0100200300400200520082012

How they compare

Angola currently reports 348 days against 330 days in Lesotho, a difference of 18 days.

That makes Angola's figure about 1.1 times Lesotho's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Lesotho ahead.

Angola ranks 4th and Lesotho ranks 5th of 50 countries.

Lesotho has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Angola Lesotho Difference Ahead
2000s 321 days 401.2 days 80.2 days Lesotho
2010s 330 days 330 days 0 days β€”

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Angola or Lesotho?
Angola, at 348 days against 330 days in Lesotho as of 2012.
What is the difference in time required to deal with construction permits between Angola and Lesotho?
18 days, with Angola ahead.
How many years of comparable data are there for Angola and Lesotho?
8 years are reported by both, from 2005 to 2012.
How do Angola and Lesotho rank globally for time required to deal with construction permits?
Angola ranks 4th and Lesotho ranks 5th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Angola vs Lesotho: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/angola/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/angola/lesotho/">Angola vs Lesotho: Time required to deal with construction permits</a> β€” Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.