Angola vs Lesotho: Time required to deal with construction permits
Angola
348 days
in 2012
Lesotho
330 days
in 2012
Angola rank
4th
Lesotho rank
5th
Time required to deal with construction permits over time
- Angola
- Lesotho
How they compare
Angola currently reports 348 days against 330 days in Lesotho, a difference of 18 days.
That makes Angola's figure about 1.1 times Lesotho's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Lesotho ahead.
Angola ranks 4th and Lesotho ranks 5th of 50 countries.
Lesotho has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Angola | Lesotho | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 321 days | 401.2 days | 80.2 days | Lesotho |
| 2010s | 330 days | 330 days | 0 days | β |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Angola or Lesotho?
- Angola, at 348 days against 330 days in Lesotho as of 2012.
- What is the difference in time required to deal with construction permits between Angola and Lesotho?
- 18 days, with Angola ahead.
- How many years of comparable data are there for Angola and Lesotho?
- 8 years are reported by both, from 2005 to 2012.
- How do Angola and Lesotho rank globally for time required to deal with construction permits?
- Angola ranks 4th and Lesotho ranks 5th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.