Angola vs Niger: Time required to deal with construction permits

Angola
348 days
in 2012
Niger
326 days
in 2012
Angola rank
4th
Niger rank
6th

Time required to deal with construction permits over time

  • Angola
  • Niger
0100200300200520082012

How they compare

Angola currently reports 348 days against 326 days in Niger, a difference of 22 days.

That makes Angola's figure about 1.1 times Niger's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Niger ahead.

Angola ranks 4th and Niger ranks 6th of 50 countries.

Across the 2 decades both report, Angola averaged higher in 1 and Niger in 1.

Head to head by decade

Decade Angola Niger Difference Ahead
2000s 321 days 327.8 days 6.8 days Niger
2010s 330 days 326 days 4 days Angola

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Angola or Niger?
Angola, at 348 days against 326 days in Niger as of 2012.
What is the difference in time required to deal with construction permits between Angola and Niger?
22 days, with Angola ahead.
How many years of comparable data are there for Angola and Niger?
8 years are reported by both, from 2005 to 2012.
How do Angola and Niger rank globally for time required to deal with construction permits?
Angola ranks 4th and Niger ranks 6th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Angola vs Niger: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/angola/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/angola/niger/">Angola vs Niger: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.