Angola vs Zimbabwe: Time required to deal with construction permits
Angola
348 days
in 2012
Zimbabwe
614 days
in 2012
Angola rank
4th
Zimbabwe rank
1st
Time required to deal with construction permits over time
- Angola
- Zimbabwe
How they compare
Zimbabwe currently reports 614 days against 348 days in Angola, a difference of 266 days.
That makes Zimbabwe's figure about 1.8 times Angola's.
Across all 8 years both countries report, Zimbabwe has been ahead every year.
Angola ranks 4th and Zimbabwe ranks 1st of 50 countries.
Zimbabwe has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Angola | Zimbabwe | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 321 days | 482.8 days | 161.8 days | Zimbabwe |
| 2010s | 330 days | 614 days | 284 days | Zimbabwe |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Angola or Zimbabwe?
- Zimbabwe, at 614 days against 348 days in Angola as of 2012.
- What is the difference in time required to deal with construction permits between Angola and Zimbabwe?
- 266 days, with Zimbabwe ahead.
- How many years of comparable data are there for Angola and Zimbabwe?
- 8 years are reported by both, from 2005 to 2012.
- How do Angola and Zimbabwe rank globally for time required to deal with construction permits?
- Angola ranks 4th and Zimbabwe ranks 1st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.