Benin vs Lesotho: Time required to deal with construction permits
Benin
282 days
in 2012
Lesotho
330 days
in 2012
Benin rank
8th
Lesotho rank
5th
Time required to deal with construction permits over time
- Benin
- Lesotho
How they compare
Lesotho currently reports 330 days against 282 days in Benin, a difference of 48 days.
That makes Lesotho's figure about 1.2 times Benin's.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Lesotho ahead.
Benin ranks 8th and Lesotho ranks 5th of 50 countries.
Benin has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Benin | Lesotho | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 415.2 days | 401.2 days | 14 days | Benin |
| 2010s | 342 days | 330 days | 12 days | Benin |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Benin or Lesotho?
- Lesotho, at 330 days against 282 days in Benin as of 2012.
- What is the difference in time required to deal with construction permits between Benin and Lesotho?
- 48 days, with Lesotho ahead.
- How many years of comparable data are there for Benin and Lesotho?
- 8 years are reported by both, from 2005 to 2012.
- How do Benin and Lesotho rank globally for time required to deal with construction permits?
- Benin ranks 8th and Lesotho ranks 5th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.