Benin vs Sudan: Time required to deal with construction permits
Benin
282 days
in 2012
Sudan
270 days
in 2012
Benin rank
8th
Sudan rank
10th
Time required to deal with construction permits over time
- Benin
- Sudan
How they compare
Benin currently reports 282 days against 270 days in Sudan, a difference of 12 days.
Across all 8 years both countries report, Benin has been ahead every year.
Benin ranks 8th and Sudan ranks 10th of 50 countries.
Benin has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Benin | Sudan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 415.2 days | 270 days | 145.2 days | Benin |
| 2010s | 342 days | 270 days | 72 days | Benin |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Benin or Sudan?
- Benin, at 282 days against 270 days in Sudan as of 2012.
- What is the difference in time required to deal with construction permits between Benin and Sudan?
- 12 days, with Benin ahead.
- How many years of comparable data are there for Benin and Sudan?
- 8 years are reported by both, from 2005 to 2012.
- How do Benin and Sudan rank globally for time required to deal with construction permits?
- Benin ranks 8th and Sudan ranks 10th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.