Benin vs Togo: Time required to deal with construction permits

Benin
282 days
in 2012
Togo
309 days
in 2012
Benin rank
8th
Togo rank
7th

Time required to deal with construction permits over time

  • Benin
  • Togo
0100200300400500200520082012

How they compare

Togo currently reports 309 days against 282 days in Benin, a difference of 27 days.

That makes Togo's figure about 1.1 times Benin's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Benin ahead.

Benin ranks 8th and Togo ranks 7th of 50 countries.

Benin has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Benin Togo Difference Ahead
2000s 415.2 days 309 days 106.2 days Benin
2010s 342 days 309 days 33 days Benin

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Benin or Togo?
Togo, at 309 days against 282 days in Benin as of 2012.
What is the difference in time required to deal with construction permits between Benin and Togo?
27 days, with Togo ahead.
How many years of comparable data are there for Benin and Togo?
8 years are reported by both, from 2005 to 2012.
How do Benin and Togo rank globally for time required to deal with construction permits?
Benin ranks 8th and Togo ranks 7th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Benin vs Togo: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/benin/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/benin/togo/">Benin vs Togo: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.