Benin vs Togo: Time required to deal with construction permits
Benin
282 days
in 2012
Togo
309 days
in 2012
Benin rank
8th
Togo rank
7th
Time required to deal with construction permits over time
- Benin
- Togo
How they compare
Togo currently reports 309 days against 282 days in Benin, a difference of 27 days.
That makes Togo's figure about 1.1 times Benin's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Benin ahead.
Benin ranks 8th and Togo ranks 7th of 50 countries.
Benin has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Benin | Togo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 415.2 days | 309 days | 106.2 days | Benin |
| 2010s | 342 days | 309 days | 33 days | Benin |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Benin or Togo?
- Togo, at 309 days against 282 days in Benin as of 2012.
- What is the difference in time required to deal with construction permits between Benin and Togo?
- 27 days, with Togo ahead.
- How many years of comparable data are there for Benin and Togo?
- 8 years are reported by both, from 2005 to 2012.
- How do Benin and Togo rank globally for time required to deal with construction permits?
- Benin ranks 8th and Togo ranks 7th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.