Botswana vs Cameroon: Time required to deal with construction permits

Botswana
145 days
in 2012
Cameroon
147 days
in 2012
Botswana rank
30th
Cameroon rank
29th

Time required to deal with construction permits over time

  • Botswana
  • Cameroon
050100150200520082012

How they compare

Cameroon currently reports 147 days against 145 days in Botswana, a difference of 2 days.

Across all 8 years both countries report, Cameroon has been ahead every year.

Botswana ranks 30th and Cameroon ranks 29th of 50 countries.

Cameroon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Botswana Cameroon Difference Ahead
2000s 139 days 159 days 20 days Cameroon
2010s 145 days 147 days 2 days Cameroon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Botswana or Cameroon?
Cameroon, at 147 days against 145 days in Botswana as of 2012.
What is the difference in time required to deal with construction permits between Botswana and Cameroon?
2 days, with Cameroon ahead.
How many years of comparable data are there for Botswana and Cameroon?
8 years are reported by both, from 2005 to 2012.
How do Botswana and Cameroon rank globally for time required to deal with construction permits?
Botswana ranks 30th and Cameroon ranks 29th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.