Botswana vs Cameroon: Time required to deal with construction permits
Botswana
145 days
in 2012
Cameroon
147 days
in 2012
Botswana rank
30th
Cameroon rank
29th
Time required to deal with construction permits over time
- Botswana
- Cameroon
How they compare
Cameroon currently reports 147 days against 145 days in Botswana, a difference of 2 days.
Across all 8 years both countries report, Cameroon has been ahead every year.
Botswana ranks 30th and Cameroon ranks 29th of 50 countries.
Cameroon has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Botswana | Cameroon | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 139 days | 159 days | 20 days | Cameroon |
| 2010s | 145 days | 147 days | 2 days | Cameroon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Botswana or Cameroon?
- Cameroon, at 147 days against 145 days in Botswana as of 2012.
- What is the difference in time required to deal with construction permits between Botswana and Cameroon?
- 2 days, with Cameroon ahead.
- How many years of comparable data are there for Botswana and Cameroon?
- 8 years are reported by both, from 2005 to 2012.
- How do Botswana and Cameroon rank globally for time required to deal with construction permits?
- Botswana ranks 30th and Cameroon ranks 29th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.