Time required to deal with construction permits (days) in Botswana

Botswana: Time required to deal with construction permits (days) was 145 days in 2012. ▲ Rising

Latest (2012)
145 days
Change on year
unchanged
World rank
30th
of 50 countries
All-time high
145 days
in 2006
All-time low
115 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Botswana, 2005–2012

0501001502005200820122005: 115 days2006: 145 days2007: 145 days2008: 145 days2009: 145 days2010: 145 days2011: 145 days2012: 145 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Botswana stood at 145 days. That is the highest value across all 8 years on record.

That represents a change of up 26.1% over ten years.

Botswana ranks 30th of 50 countries on this measure, in the middle of the range.

Time required to deal with construction permits (days) in Botswana, year by year

Annual values for Time required to deal with construction permits (days) in Botswana, 2005 to 2012.
Year days Change
2005 115 days —
2006 145 days +26.1%
2007 145 days +0.0%
2008 145 days +0.0%
2009 145 days +0.0%
2010 145 days +0.0%
2011 145 days +0.0%
2012 145 days +0.0%

Botswana compared with similar countries

  • Botswana's 145 days is above the median for upper middle income countries, which is 145 days, 1.0× the median. (7 countries reporting)
  • Botswana's 145 days is below the median for Sub-Saharan Africa, which is 164 days, 88% of the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 139 days 115 days 145 days 5
2010s 145 days 145 days 145 days 3

Countries ranked near Botswana

  1. 27 Guinea-Bissau 163 days compare
  2. 28 Chad 154 days compare
  3. 29 Cameroon 147 days compare
  4. 31 Comoros 143 days compare
  5. 31 Gambia 143 days compare
  6. 31 Mauritius 143 days compare

See the full ranking of 56 places →

More private sector data for Botswana

All data for Botswana →

Frequently asked questions

What is time required to deal with construction permits in Botswana?
Time required to deal with construction permits in Botswana was 145 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Botswana?
The highest recorded value was 145 days in 2006.
What is the lowest time required to deal with construction permits recorded in Botswana?
The lowest recorded value was 115 days in 2005.
How does Botswana rank for time required to deal with construction permits?
Botswana ranks 30th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Botswana?
Over the last ten years it is up 26.1%. The long-run trend across the full record is rising.
Where does this Botswana data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Botswana. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/botswana/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/botswana/">Time required to deal with construction permits in Botswana</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.