Botswana vs Comoros: Time required to deal with construction permits
Botswana
145 days
in 2012
Comoros
143 days
in 2012
Botswana rank
30th
Comoros rank
31st
Time required to deal with construction permits over time
- Botswana
- Comoros
How they compare
Botswana currently reports 145 days against 143 days in Comoros, a difference of 2 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Comoros ahead.
Botswana ranks 30th and Comoros ranks 31st of 50 countries.
Across the 2 decades both report, Botswana averaged higher in 1 and Comoros in 1.
Head to head by decade
| Decade | Botswana | Comoros | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 139 days | 143 days | 4 days | Comoros |
| 2010s | 145 days | 143 days | 2 days | Botswana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Botswana or Comoros?
- Botswana, at 145 days against 143 days in Comoros as of 2012.
- What is the difference in time required to deal with construction permits between Botswana and Comoros?
- 2 days, with Botswana ahead.
- How many years of comparable data are there for Botswana and Comoros?
- 8 years are reported by both, from 2005 to 2012.
- How do Botswana and Comoros rank globally for time required to deal with construction permits?
- Botswana ranks 30th and Comoros ranks 31st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.