Time required to deal with construction permits in Comoros
Comoros: Time required to deal with construction permits was 143 days in 2012. ▬ Flat
Time required to deal with construction permits in Comoros, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
In 2012, time required to deal with construction permits in Comoros stood at 143 days. That is the highest value across all 8 years on record.
The figure is unchanged over ten years.
That places Comoros 31st out of 50 countries with data for 2012, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 143 days | 143 days | 143 days | 5 |
| 2010s | 143 days | 143 days | 143 days | 3 |
Countries ranked near Comoros
More private sector data for Comoros
- Merchandise trade 23.1% (2025)
- Food imports 42.1% (2023)
- Manufactures imports 46.5% (2023)
- Merchandise imports 371.00 million current US$ (2025)
- Food exports 88.5% (2023)
- Manufactures exports 10.2% (2023)
- Merchandise exports 48.00 million current US$ (2025)
- Commercial service exports 110.18 million current US$ (2023)
- Transport services 40.9% (2023)
- Computer, communications and other services 12.7% (2023)
Frequently asked questions
- What is time required to deal with construction permits in Comoros?
- Time required to deal with construction permits in Comoros was 143 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Comoros?
- The highest recorded value was 143 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Comoros?
- The lowest recorded value was 143 days in 2005.
- How does Comoros rank for time required to deal with construction permits?
- Comoros ranks 31st out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Comoros?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Comoros data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.