Time required to deal with construction permits in Comoros

Comoros: Time required to deal with construction permits was 143 days in 2012. ▬ Flat

Latest (2012)
143 days
Change on year
unchanged
World rank
31st
of 50 countries
All-time high
143 days
in 2005
All-time low
143 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Comoros, 2005–2012

0501001502005200820122005: 143 days2006: 143 days2007: 143 days2008: 143 days2009: 143 days2010: 143 days2011: 143 days2012: 143 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Comoros stood at 143 days. That is the highest value across all 8 years on record.

The figure is unchanged over ten years.

That places Comoros 31st out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 143 days 143 days 143 days 5
2010s 143 days 143 days 143 days 3

Countries ranked near Comoros

  1. 28 Chad 154 days compare
  2. 29 Cameroon 147 days compare
  3. 30 Botswana 145 days compare
  4. 31 Gambia 143 days compare
  5. 31 Mauritius 143 days compare
  6. 34 Namibia 139 days compare

See the full ranking of 56 places →

More private sector data for Comoros

All data for Comoros →

Frequently asked questions

What is time required to deal with construction permits in Comoros?
Time required to deal with construction permits in Comoros was 143 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Comoros?
The highest recorded value was 143 days in 2005.
What is the lowest time required to deal with construction permits recorded in Comoros?
The lowest recorded value was 143 days in 2005.
How does Comoros rank for time required to deal with construction permits?
Comoros ranks 31st out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Comoros?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Comoros data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.