Burkina Faso vs Democratic Republic of Congo: Time required to deal with construction permits

Burkina Faso
98 days
in 2012
Democratic Republic of Congo
117 days
in 2012
Burkina Faso rank
44th
Democratic Republic of Congo rank
42nd

Time required to deal with construction permits over time

  • Burkina Faso
  • Democratic Republic of Congo
0100200300200520082012

How they compare

Democratic Republic of Congo currently reports 117 days against 98 days in Burkina Faso, a difference of 19 days.

That makes Democratic Republic of Congo's figure about 1.2 times Burkina Faso's.

Across all 8 years both countries report, Democratic Republic of Congo has been ahead every year.

Burkina Faso ranks 44th and Democratic Republic of Congo ranks 42nd of 50 countries.

Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Burkina Faso Democratic Republic of Congo Difference Ahead
2000s 188.6 days 250.6 days 62 days Democratic Republic of Congo
2010s 98 days 117 days 19 days Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Burkina Faso or Democratic Republic of Congo?
Democratic Republic of Congo, at 117 days against 98 days in Burkina Faso as of 2012.
What is the difference in time required to deal with construction permits between Burkina Faso and Democratic Republic of Congo?
19 days, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Burkina Faso and Democratic Republic of Congo?
8 years are reported by both, from 2005 to 2012.
How do Burkina Faso and Democratic Republic of Congo rank globally for time required to deal with construction permits?
Burkina Faso ranks 44th and Democratic Republic of Congo ranks 42nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burkina Faso vs Democratic Republic of Congo: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burkina-faso/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burkina-faso/congo-dem-rep/">Burkina Faso vs Democratic Republic of Congo: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.