Burkina Faso vs Democratic Republic of Congo: Time required to deal with construction permits
Burkina Faso
98 days
in 2012
Democratic Republic of Congo
117 days
in 2012
Burkina Faso rank
44th
Democratic Republic of Congo rank
42nd
Time required to deal with construction permits over time
- Burkina Faso
- Democratic Republic of Congo
How they compare
Democratic Republic of Congo currently reports 117 days against 98 days in Burkina Faso, a difference of 19 days.
That makes Democratic Republic of Congo's figure about 1.2 times Burkina Faso's.
Across all 8 years both countries report, Democratic Republic of Congo has been ahead every year.
Burkina Faso ranks 44th and Democratic Republic of Congo ranks 42nd of 50 countries.
Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Burkina Faso | Democratic Republic of Congo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 188.6 days | 250.6 days | 62 days | Democratic Republic of Congo |
| 2010s | 98 days | 117 days | 19 days | Democratic Republic of Congo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Burkina Faso or Democratic Republic of Congo?
- Democratic Republic of Congo, at 117 days against 98 days in Burkina Faso as of 2012.
- What is the difference in time required to deal with construction permits between Burkina Faso and Democratic Republic of Congo?
- 19 days, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Burkina Faso and Democratic Republic of Congo?
- 8 years are reported by both, from 2005 to 2012.
- How do Burkina Faso and Democratic Republic of Congo rank globally for time required to deal with construction permits?
- Burkina Faso ranks 44th and Democratic Republic of Congo ranks 42nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.