Time required to deal with construction permits (days) in Democratic Republic of Congo

Democratic Republic of Congo: Time required to deal with construction permits (days) was 117 days in 2012. ▼ Falling

Latest (2012)
117 days
Change on year
unchanged
World rank
42nd
of 50 countries
All-time high
254 days
in 2005
All-time low
117 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Democratic Republic of Congo, 2005–2012

01002003002005200820122005: 254 days2006: 254 days2007: 254 days2008: 254 days2009: 237 days2010: 117 days2011: 117 days2012: 117 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Democratic Republic of Congo stood at 117 days. That is the lowest value across all 8 years on record.

That represents a change of down 53.9% over ten years.

Democratic Republic of Congo ranks 42nd of 50 countries on this measure, in the bottom quarter.

Time required to deal with construction permits (days) in Democratic Republic of Congo, year by year

Annual values for Time required to deal with construction permits (days) in Democratic Republic of Congo, 2005 to 2012.
Year days Change
2005 254 days —
2006 254 days +0.0%
2007 254 days +0.0%
2008 254 days +0.0%
2009 237 days -6.7%
2010 117 days -50.6%
2011 117 days +0.0%
2012 117 days +0.0%

Democratic Republic of Congo compared with similar countries

  • Democratic Republic of Congo's 117 days is below the median for low income countries, which is 163.5 days, 72% of the median. (18 countries reporting)
  • Democratic Republic of Congo's 117 days is below the median for Sub-Saharan Africa, which is 164 days, 71% of the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 250.6 days 237 days 254 days 5
2010s 117 days 117 days 117 days 3

Countries ranked near Democratic Republic of Congo

  1. 40 Cape Verde 122 days compare
  2. 41 Sao Tome and Principe 118 days compare
  3. 43 Burundi 99 days compare
  4. 44 Burkina Faso 98 days compare
  5. 45 Morocco 97 days compare

See the full ranking of 56 places →

More private sector data for Democratic Republic of Congo

All data for Democratic Republic of Congo →

Frequently asked questions

What is time required to deal with construction permits in Democratic Republic of Congo?
Time required to deal with construction permits in Democratic Republic of Congo was 117 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Democratic Republic of Congo?
The highest recorded value was 254 days in 2005.
What is the lowest time required to deal with construction permits recorded in Democratic Republic of Congo?
The lowest recorded value was 117 days in 2010.
How does Democratic Republic of Congo rank for time required to deal with construction permits?
Democratic Republic of Congo ranks 42nd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Democratic Republic of Congo?
Over the last ten years it is down 53.9%. The long-run trend across the full record is falling.
Where does this Democratic Republic of Congo data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Democratic Republic of Congo. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/congo-dem-rep/">Time required to deal with construction permits in Democratic Republic of Congo</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.