Time required to deal with construction permits in Burkina Faso

Burkina Faso: Time required to deal with construction permits was 98 days in 2012. ▼ Falling

Latest (2012)
98 days
Change on year
unchanged
World rank
44th
of 50 countries
All-time high
214 days
in 2008
All-time low
98 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Burkina Faso, 2005–2012

0501001502002005200820122005: 207 days2006: 207 days2007: 207 days2008: 214 days2009: 108 days2010: 98 days2011: 98 days2012: 98 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Burkina Faso recorded 98 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 52.7% over ten years.

That places Burkina Faso 44th out of 50 countries with data for 2012, putting it in the bottom quarter.

Time required to deal with construction permits in Burkina Faso, year by year

Annual values for Time required to deal with construction permits (days) in Burkina Faso, 2005 to 2012.
Year days Change
2005 207 days
2006 207 days +0.0%
2007 207 days +0.0%
2008 214 days +3.4%
2009 108 days -49.5%
2010 98 days -9.3%
2011 98 days +0.0%
2012 98 days +0.0%

Averages by decade

DecadeAverage LowestHighest Years
2000s 188.6 days 108 days 214 days 5
2010s 98 days 98 days 98 days 3

Countries ranked near Burkina Faso

  1. 41 Sao Tome and Principe 118 days compare
  2. 42 Congo, Democratic Republic of the 117 days compare
  3. 43 Burundi 99 days compare
  4. 45 Morocco 97 days compare
  5. 46 Eswatini 95 days compare
  6. 47 Tunisia 88 days compare

See the full ranking of 56 places →

More private sector data for Burkina Faso

All data for Burkina Faso →

Frequently asked questions

What is time required to deal with construction permits in Burkina Faso?
Time required to deal with construction permits in Burkina Faso was 98 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Burkina Faso?
The highest recorded value was 214 days in 2008.
What is the lowest time required to deal with construction permits recorded in Burkina Faso?
The lowest recorded value was 98 days in 2010.
How does Burkina Faso rank for time required to deal with construction permits?
Burkina Faso ranks 44th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Burkina Faso?
Over the last ten years it is down 52.7%. The long-run trend across the full record is falling.
Where does this Burkina Faso data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Burkina Faso. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 25 August 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/burkina-faso/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/burkina-faso/">Time required to deal with construction permits in Burkina Faso</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.