Burkina Faso vs Eswatini: Time required to deal with construction permits

Burkina Faso
98 days
in 2012
Eswatini
95 days
in 2012
Burkina Faso rank
44th
Eswatini rank
46th

Time required to deal with construction permits over time

  • Burkina Faso
  • Eswatini
050100150200200520082012

How they compare

Burkina Faso currently reports 98 days against 95 days in Eswatini, a difference of 3 days.

Across all 8 years both countries report, Burkina Faso has been ahead every year.

Burkina Faso ranks 44th and Eswatini ranks 46th of 50 countries.

Burkina Faso has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Burkina Faso Eswatini Difference Ahead
2000s 188.6 days 95 days 93.6 days Burkina Faso
2010s 98 days 95 days 3 days Burkina Faso

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Burkina Faso or Eswatini?
Burkina Faso, at 98 days against 95 days in Eswatini as of 2012.
What is the difference in time required to deal with construction permits between Burkina Faso and Eswatini?
3 days, with Burkina Faso ahead.
How many years of comparable data are there for Burkina Faso and Eswatini?
8 years are reported by both, from 2005 to 2012.
How do Burkina Faso and Eswatini rank globally for time required to deal with construction permits?
Burkina Faso ranks 44th and Eswatini ranks 46th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burkina Faso vs Eswatini: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burkina-faso/eswatini/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burkina-faso/eswatini/">Burkina Faso vs Eswatini: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.