Time required to deal with construction permits (days) in Eswatini
Eswatini: Time required to deal with construction permits (days) was 95 days in 2012. ▬ Flat
Time required to deal with construction permits in Eswatini, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
The most recent figure for time required to deal with construction permits in Eswatini is 95 days, measured in 2012. That is the highest value across all 8 years on record.
Compared with earlier readings it is unchanged over ten years.
That places Eswatini 46th out of 50 countries with data for 2012, putting it in the bottom quarter.
Time required to deal with construction permits (days) in Eswatini, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 95 days | — |
| 2006 | 95 days | +0.0% |
| 2007 | 95 days | +0.0% |
| 2008 | 95 days | +0.0% |
| 2009 | 95 days | +0.0% |
| 2010 | 95 days | +0.0% |
| 2011 | 95 days | +0.0% |
| 2012 | 95 days | +0.0% |
Eswatini compared with similar countries
- Eswatini's 95 days is below the median for lower middle income countries, which is 196.5 days, 48% of the median. (24 countries reporting)
- Eswatini's 95 days is below the median for Sub-Saharan Africa, which is 164 days, 58% of the median. (45 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 95 days | 95 days | 95 days | 5 |
| 2010s | 95 days | 95 days | 95 days | 3 |
Countries ranked near Eswatini
More private sector data for Eswatini
- Merchandise trade 86.4% (2025)
- Food imports 19.6% (2023)
- Manufactures imports 58.1% (2023)
- Merchandise imports 2.09 billion current US$ (2025)
- Commercial service imports 727.36 million current US$ (2025)
- Food exports 29.7% (2023)
- Manufactures exports 59.8% (2023)
- Merchandise exports 2.37 billion current US$ (2025)
- Commercial service exports 311.96 million current US$ (2025)
- Merchandise exports (current US$), per capita 1,887 current US$ per person (2025)
Frequently asked questions
- What is time required to deal with construction permits in Eswatini?
- Time required to deal with construction permits in Eswatini was 95 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Eswatini?
- The highest recorded value was 95 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Eswatini?
- The lowest recorded value was 95 days in 2005.
- How does Eswatini rank for time required to deal with construction permits?
- Eswatini ranks 46th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Eswatini?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Eswatini data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.