Time required to deal with construction permits (days) in Eswatini

Eswatini: Time required to deal with construction permits (days) was 95 days in 2012. ▬ Flat

Latest (2012)
95 days
Change on year
unchanged
World rank
46th
of 50 countries
All-time high
95 days
in 2005
All-time low
95 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Eswatini, 2005–2012

0204060801002005200820122005: 95 days2006: 95 days2007: 95 days2008: 95 days2009: 95 days2010: 95 days2011: 95 days2012: 95 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Eswatini is 95 days, measured in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Eswatini 46th out of 50 countries with data for 2012, putting it in the bottom quarter.

Time required to deal with construction permits (days) in Eswatini, year by year

Annual values for Time required to deal with construction permits (days) in Eswatini, 2005 to 2012.
Year days Change
2005 95 days —
2006 95 days +0.0%
2007 95 days +0.0%
2008 95 days +0.0%
2009 95 days +0.0%
2010 95 days +0.0%
2011 95 days +0.0%
2012 95 days +0.0%

Eswatini compared with similar countries

  • Eswatini's 95 days is below the median for lower middle income countries, which is 196.5 days, 48% of the median. (24 countries reporting)
  • Eswatini's 95 days is below the median for Sub-Saharan Africa, which is 164 days, 58% of the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 95 days 95 days 95 days 5
2010s 95 days 95 days 95 days 3

Countries ranked near Eswatini

  1. 43 Burundi 99 days compare
  2. 44 Burkina Faso 98 days compare
  3. 45 Morocco 97 days compare
  4. 47 Tunisia 88 days compare
  5. 48 Nigeria 85 days compare
  6. 49 Mauritania 82 days compare

See the full ranking of 56 places →

More private sector data for Eswatini

All data for Eswatini →

Frequently asked questions

What is time required to deal with construction permits in Eswatini?
Time required to deal with construction permits in Eswatini was 95 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Eswatini?
The highest recorded value was 95 days in 2005.
What is the lowest time required to deal with construction permits recorded in Eswatini?
The lowest recorded value was 95 days in 2005.
How does Eswatini rank for time required to deal with construction permits?
Eswatini ranks 46th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Eswatini?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Eswatini data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Eswatini. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/eswatini/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/eswatini/">Time required to deal with construction permits in Eswatini</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.