Burkina Faso vs Morocco: Time required to deal with construction permits

Burkina Faso
98 days
in 2012
Morocco
97 days
in 2012
Burkina Faso rank
44th
Morocco rank
45th

Time required to deal with construction permits over time

  • Burkina Faso
  • Morocco
050100150200200520082012

How they compare

Burkina Faso currently reports 98 days against 97 days in Morocco, a difference of 1 days.

The two have swapped places 2 times across 8 shared years of data; in 2005 it was Burkina Faso ahead.

Burkina Faso ranks 44th and Morocco ranks 45th of 50 countries.

Across the 2 decades both report, Burkina Faso averaged higher in 1 and Morocco in 1.

Head to head by decade

Decade Burkina Faso Morocco Difference Ahead
2000s 188.6 days 108 days 80.6 days Burkina Faso
2010s 98 days 99.33 days 1.33 days Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Burkina Faso or Morocco?
Burkina Faso, at 98 days against 97 days in Morocco as of 2012.
What is the difference in time required to deal with construction permits between Burkina Faso and Morocco?
1 days, with Burkina Faso ahead.
How many years of comparable data are there for Burkina Faso and Morocco?
8 years are reported by both, from 2005 to 2012.
How do Burkina Faso and Morocco rank globally for time required to deal with construction permits?
Burkina Faso ranks 44th and Morocco ranks 45th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burkina Faso vs Morocco: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burkina-faso/morocco/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burkina-faso/morocco/">Burkina Faso vs Morocco: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.