Time required to deal with construction permits (days) in Morocco

Morocco: Time required to deal with construction permits (days) was 97 days in 2012. ▼ Falling

Latest (2012)
97 days
Change on year
unchanged
World rank
45th
of 50 countries
All-time high
114 days
in 2005
All-time low
97 days
in 2011
Years of data
8
2005–2012

Time required to deal with construction permits in Morocco, 2005–2012

02550751001252005200820122005: 114 days2006: 114 days2007: 104 days2008: 104 days2009: 104 days2010: 104 days2011: 97 days2012: 97 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Morocco is 97 days, measured in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 14.9% over ten years.

Morocco ranks 45th of 50 countries on this measure, in the bottom quarter.

Time required to deal with construction permits (days) in Morocco, year by year

Annual values for Time required to deal with construction permits (days) in Morocco, 2005 to 2012.
Year days Change
2005 114 days —
2006 114 days +0.0%
2007 104 days -8.8%
2008 104 days +0.0%
2009 104 days +0.0%
2010 104 days +0.0%
2011 97 days -6.7%
2012 97 days +0.0%

Morocco compared with similar countries

  • Morocco's 97 days is below the median for lower middle income countries, which is 196.5 days, 49% of the median. (24 countries reporting)
  • Morocco's 97 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 172 days, 56% of the median. (5 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 108 days 104 days 114 days 5
2010s 99.33 days 97 days 104 days 3

Countries ranked near Morocco

  1. 42 Democratic Republic of Congo 117 days compare
  2. 43 Burundi 99 days compare
  3. 44 Burkina Faso 98 days compare
  4. 46 Eswatini 95 days compare
  5. 47 Tunisia 88 days compare
  6. 48 Nigeria 85 days compare

See the full ranking of 56 places →

More private sector data for Morocco

All data for Morocco →

Frequently asked questions

What is time required to deal with construction permits in Morocco?
Time required to deal with construction permits in Morocco was 97 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Morocco?
The highest recorded value was 114 days in 2005.
What is the lowest time required to deal with construction permits recorded in Morocco?
The lowest recorded value was 97 days in 2011.
How does Morocco rank for time required to deal with construction permits?
Morocco ranks 45th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Morocco?
Over the last ten years it is down 14.9%. The long-run trend across the full record is falling.
Where does this Morocco data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Morocco. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/morocco/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/morocco/">Time required to deal with construction permits in Morocco</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.